BASELINE
provides assistance to numerous local agencies in complying with
the requirements of mitigation monitoring under the California
Environmental Quality Act (CEQA). The mitigation monitoring is
conducted to ensure that the mitigation measures in EIRs or Mitigated
Negative Declarations are implemented. The types of monitoring
that we have performed include:
- Landslide
repairs
- Construction
near heritage trees
- Noise
measurements to ensure adherence to noise standards
- Air
sampling for respirable dust, lead, and asbestos
- Adherence
to Storm Water Pollution Prevention Plans
- Management
of hazardous materials during construction
- Adherence
to health and safety plans for contaminated sites
- Enforcement
of creek setbacks during construction
|